Bidder-facingEN+TEDRAFTd5f17dc7a797b602Letter of Award — Tender HC/APCRDA/2026/PROC/001
Date: 2026-05-11
To: M/s Comprehensive Standard Builders JV (Premier Coastal + Northern Engineering + Southern Surveys)
Plot 27, MVP Colony, Visakhapatnam-530017
Attention: Mr. C. Comprehensive
Tender: Andhra Pradesh High Court complex
NIT No.: HC/APCRDA/2026/PROC/001
Estimated Contract Value (ECV): ₹365.16 crore
Dear Sir/Madam,
We are pleased to inform you that, following review by the Tender Scrutiny Committee, your bid has been adjudged the effective L1 for the captioned tender.
Award details
- Bidder: M/s Comprehensive Standard Builders JV (Premier Coastal + Northern Engineering + Southern Surveys)
- Bid amount: ₹343.25 crore
- Premium vs ECV: -6.00%
- Tender method: Item Rate (lowest bid wins among QUALIFIED)
Effective L1 derivation
The raw L1 bidder was M/s Abnormally Low Bidders Pvt Ltd at ₹226.40 crore (premium -38.00%). Per CVC norms on Abnormally Low Bids (ALB), the raw L1 was flagged as ALB and required to submit cost justification (a separate ALB_JUSTIFICATION letter has been issued). Pending that review, the effective L1 falls to the next non-ALB, non-cartel-suspect bidder — your bid.
Rationale (verbatim from ComparativeStatement):
L1 (M/s Abnormally Low Bidders Pvt Ltd) ALB-rejected per CVC norms; cartel-suspect bidders (bid_synth_profile_b6, bid_synth_profile_b7) referred to committee; first non-skipped bidder in ranking = M/s Comprehensive Standard Builders JV (Premier Coastal + Northern Engineering + Southern Surveys).
Evaluation summary
Your bid was found QUALIFIED on all 13 evaluation criteria:
Bidder-Turnover-Eligibility— ruleCVC-028— verdict QUALIFIEDBidder-Compliance-Documents-Complete— ruleAP-PROC-COMPLIANCE-DOCS-V1— verdict QUALIFIEDBidder-Solvency-Compliance— ruleAP-GO-089— verdict QUALIFIEDBidder-Blacklist-Disclosure— ruleAP-GO-096— verdict QUALIFIEDBidder-Capacity-Compliance— ruleAP-GO-062— verdict QUALIFIEDBidder-Similar-Works-Qualification— ruleMPW-040— verdict QUALIFIEDBidder-EMD-Validity— ruleMPW25-050— verdict QUALIFIEDBidder-Equipment-Coverage— ruleMPW-042— verdict QUALIFIEDBidder-Personnel-Coverage— ruleMPW-041— verdict QUALIFIEDBidder-JV-Consortium-Compliance— ruleAP-PROC-JV-CONSORTIUM-V1— verdict QUALIFIEDBidder-Class-Eligibility— ruleAP-GO-092— verdict QUALIFIEDBidder-Litigation-Disqualifier— ruleAP-GO-066— verdict QUALIFIEDBidder-Financial-Turnover-Eligibility— ruleMPG-255— verdict QUALIFIED
Next steps — LoA (Letter of Acceptance) issuance
Subject to issuance of the formal Letter of Acceptance (LoA) per APCRDA contract terms, you are required to report at the Procuring Authority's office within 14 days of receipt of this letter with the following:
- Original Letter of Bid signed by authorised signatory
- Performance Bank Guarantee (PBG) at the contractually specified rate
- Original EMD instrument (will be returned upon PBG submission)
- Initial mobilisation advance request (optional, subject to Mobilisation Advance norms)
Failure to report within 14 days will result in forfeiture of your EMD per the EMD forfeiture clauses of the tender.
Yours faithfully,
Procuring Authority
(Communication generated by SYSTEM; signed-off via approval workflow before dispatch)
Drilldown reference:
- ComparativeStatement audit_id:
277daabd52d64c0f - TenderRanking node_id:
3b6c5141-3a2f-4ff3-be5f-ef87051f86e5 - Ranking entries (5-bidder QUALIFIED set): 5
- QUALIFIED findings consumed: 13
Source Findings (15)
Every claim in this communication traces to one of these kg_nodes. Click to view the underlying evaluation finding or aggregator row.
e43cd70a-b57CVC-028 · qualified_avg_260.0cr_at_or_above_pq_floor_243.4crfc5f23d3-a05c1e1ec78-e28AP-PROC-COMPLIANCE-DOCS-V1 · qualified_all_8_compliance_docs_validee17441c-8d3AP-GO-089 · qualified_cert_Tahsildar_age_4mo_declared_1.5cr_above_required_1.0crbc4c7bac-ed4AP-GO-096 · qualified_blacklist_clean1d4e796c-a2cAP-GO-062 · qualified_M_2_arithmetic_ok_abc_540.0cr_above_ecv_365.16cr8471b2b3-f90MPW-040 · qualified_branch_3at40pct_count_3_threshold_146.064cr39697ef2-b92MPW25-050 · qualified_bg_expires_2026-11-08_outlasts_bid_validity_end_2026-08-08_margin_92d_unconditional3924939d-bd9MPW-042 · qualified_all_5_items_with_access_owned_5_leased_0_per_mpw_042_owned_or_assured_access48402dfb-fdbMPW-041 · qualified_all_6_roles_filled_with_qualified_personnel_per_mpw_0417bfca3a8-39aAP-PROC-JV-CONSORTIUM-V1 · qualified_jv_consortium_all_8_sub_checks_passed_partner_count_3ce462b93-5f3AP-GO-092 · qualified_class_Special_at_or_above_required_Special71111872-493AP-GO-066 · qualified_no_litigation_history_disclosed_per_ap_go_066b5bcf1cf-b7dMPG-255 · qualified_financial_230.0cr_at_or_above_floor_109.55cr3b6c5141-3a2Artifact files
Filesystem paths (also linked to kg_node properties)
/tmp/m4_drafts/AWARD_b9_hc.md/tmp/m4_drafts/AWARD_b9_hc.docx