BIDDER_CLARIFICATION_QA
Bidder-facingEN+TEDRAFT8efe49545bf2fad9Reply to Clarification Query — Tender HC/APCRDA/2026/PROC/001
Date: 2026-05-12
From: Procurement Authority
To: M/s Premier AP Constructions Pvt Ltd
3-5-101, Industrial Area, Vijayawada-520001
Attention: Mr. K. Rao
Tender: Andhra Pradesh High Court complex
NIT No.: HC/APCRDA/2026/PROC/001
Subject: Re: Offsite labour mobilisation in Stage 1 — query
In reply to: Communication node a35e2075-551c-4188-bdaa-1866b248e903 (your query dated 2026-05-12)
Sir/Madam,
Thank you for your detailed clarification request. Please find our response:
- Offsite labour mobilisation acceptable for Stage 1: Yes, offsite mobilisation for rebar fabrication, formwork pre-assembly, and other preparatory activities is acceptable for Stage 1 foundation works. However, on-site mobilisation of supervisory + safety + QA personnel is required from day 1 of contract commencement.
- Minimum standards for offsite yards:
- Offsite yard must be within 75 km of the project site by road (per APCRDA logistics norms)
- EPF + ESI compliance must extend to all offsite labour (your bid must address this in Statement III — Satisfactory Completion)
- Quality control: offsite-fabricated rebar must be tested per IS 1786:2008 with test certificates submitted to the on-site QA Engineer
- Transportation logistics: pre-approved by Site Engineer; daily movement report to be maintained
Please ensure your methodology document (Statement IX — Work Plan) addresses these standards. The bid must include a separate annexure listing your designated offsite yard(s) with addresses + EPF registration.
Best of luck with your bid preparation.
Yours faithfully,
Procurement Authority
(Reply generated by SYSTEM; signed-off by Dealing Officer before dispatch)
Drilldown reference:
- Question communication:
a35e2075-551c-4188-bdaa-1866b248e903 - Subject: Offsite labour mobilisation in Stage 1 — query
a35e2075-551Source Findings (1)
Every claim in this communication traces to one of these kg_nodes. Click to view the underlying evaluation finding or aggregator row.
a35e2075-551Artifact files
Filesystem paths (also linked to kg_node properties)
/tmp/m4_drafts/BIDDER_CLARIFICATION_QA_A_b1_hc.md/tmp/m4_drafts/BIDDER_CLARIFICATION_QA_A_b1_hc.docx