From: PROCUREMENT_AUTHORITYTo: M/s Premier AP Constructions Pvt LtdTender: Andhra Pradesh High Court ComplexChannel: EMAIL
Audit ID: 8efe49545bf2fad9

Reply to Clarification Query — Tender HC/APCRDA/2026/PROC/001

Date: 2026-05-12

From: Procurement Authority

To: M/s Premier AP Constructions Pvt Ltd

3-5-101, Industrial Area, Vijayawada-520001

Attention: Mr. K. Rao

Tender: Andhra Pradesh High Court complex

NIT No.: HC/APCRDA/2026/PROC/001

Subject: Re: Offsite labour mobilisation in Stage 1 — query

In reply to: Communication node a35e2075-551c-4188-bdaa-1866b248e903 (your query dated 2026-05-12)


Sir/Madam,

Thank you for your detailed clarification request. Please find our response:

  1. Offsite labour mobilisation acceptable for Stage 1: Yes, offsite mobilisation for rebar fabrication, formwork pre-assembly, and other preparatory activities is acceptable for Stage 1 foundation works. However, on-site mobilisation of supervisory + safety + QA personnel is required from day 1 of contract commencement.
  1. Minimum standards for offsite yards:
  • Offsite yard must be within 75 km of the project site by road (per APCRDA logistics norms)
  • EPF + ESI compliance must extend to all offsite labour (your bid must address this in Statement III — Satisfactory Completion)
  • Quality control: offsite-fabricated rebar must be tested per IS 1786:2008 with test certificates submitted to the on-site QA Engineer
  • Transportation logistics: pre-approved by Site Engineer; daily movement report to be maintained

Please ensure your methodology document (Statement IX — Work Plan) addresses these standards. The bid must include a separate annexure listing your designated offsite yard(s) with addresses + EPF registration.

Best of luck with your bid preparation.


Yours faithfully,

Procurement Authority

(Reply generated by SYSTEM; signed-off by Dealing Officer before dispatch)

Drilldown reference:

  • Question communication: a35e2075-551c-4188-bdaa-1866b248e903
  • Subject: Offsite labour mobilisation in Stage 1 — query

Source Findings (1)

Every claim in this communication traces to one of these kg_nodes. Click to view the underlying evaluation finding or aggregator row.

Communicationa35e2075-551
BIDDER_CLARIFICATION_Q — M/s Premier AP Constructions Pvt Ltd → Offsite labour mobilisation in Stage 1 — query
Drilldown

Artifact files

Filesystem paths (also linked to kg_node properties)

Markdown
/tmp/m4_drafts/BIDDER_CLARIFICATION_QA_A_b1_hc.md
DOCX
/tmp/m4_drafts/BIDDER_CLARIFICATION_QA_A_b1_hc.docx